>

Recent Posts

Sunday, October 7, 2012

human comp collab install

  1. IDENTIFICATION
    put your name, MW or TTH, table number on the back each of your individual comps. write on tape or label and secure to back.
  2. INSTALLATION
    ROLLING WALLS each table team is to use ONE SIDE of one rolling walls.

    PRESENTATION install the entire teams work paying attention to formal and conceptual relationships and sequencing

    NAME TAG create a small table team tag. include table team number and each team members first name.

    ATTACHMENT use sticky velcro dots to secure pictures to plywood walls.
    if strategically placed, each image should only need one dot.
    NO other types of sticky stuff may be used.

    WHEN work should be installed prior to 9 pm crit day (10/8 - MW; 10/9 - TTH)
  1. DEINSTALLATION
    AFTER space studio is fully dismissed by Valerie, remove velcro from team wall. if a residue is left on wall, your team will need to remove it with goobe gone before 5 pm.

    KK will photographs

No comments:

Post a Comment

WASH